Skip to main content
WeCostSegFree proposal

How to Prepare Your Property for a Cost Seg Study

By Zawwad Ul Sami, Founder, WeCostSegPublished: 2026-05-14Last updated: 2026-05-14

Prepare for a cost seg study by gathering closing documents, blueprints (if available), photos of any post-purchase improvements, prior depreciation schedules, and a list of personal property included in the sale. WeCostSeg provides a complete checklist on engagement. Most documents are available from your closing or property management records.

Required documents

Closing statement (HUD-1, ALTA, or settlement statement). Documents the purchase price, allocation, and closing date. Required for every study.

Appraisal if available. The appraiser's allocation between land and building is a useful starting point for the land/building split.

Prior depreciation schedules if the property was previously owned and depreciated. Required for look-back studies. Helpful for current-year studies to confirm prior treatment.

Highly recommended

Blueprints or property layout. Provide accurate measurements for component allocation. Most useful for commercial properties. Less critical for residential.

Photos of post-purchase improvements. Document any changes made between closing and the cost seg study. Important if improvements substantially changed the property's component mix.

List of personal property included in the sale. Furniture, appliances, fixtures included with the purchase. Affects the 5-year personal property allocation.

Optional but valuable

Construction cost records for self-built or substantially renovated property. The engineer uses these for Pub 5653 Chapter 3 Method 1 (detailed engineering approach from actual cost records).

Tenant lease agreements showing tenant-owned vs landlord-owned improvements. Affects component allocation between the property owner's basis and tenant improvements.

Property inspection prep

For virtual inspection (residential), prepare to walk the property with the engineer via video. Have good lighting, hold the camera steady, and follow the engineer's prompts to capture specific component views.

For in-person inspection (commercial), ensure the engineer has access to all areas including utility rooms, roof, parking, and tenant spaces (with tenant consent). Schedule for daytime to capture exterior components.

Frequently asked questions

How does WeCostSeg coordinate with my CPA?
Every engagement follows the three-touch CPA Coordination Protocol. Preliminary analysis CC'd to your CPA on intake, draft report shared five business days before final delivery, and Form 3115 filing coordinated when a Section 481(a) adjustment applies.
Does OBBBA's 100% bonus apply to my acquisition?
100% applies to property under a binding contract on or after January 20, 2025 per Public Law 119-21. Property under a binding contract on or before January 19, 2025 stays on the legacy phase-down: 40% in 2025, 20% in 2026, 0% in 2027 and after.
Is audit defense included?
Yes. Every WeCostSeg engagement includes five years of written audit defense at no extra charge, aligned to the 13 Principal Elements of a Quality Cost Segregation Study under IRS Publication 5653 Chapter 4.
Can I get a free preliminary analysis?
Yes. Submit property details via the free proposal form or WhatsApp. Engineer-reviewed estimate returned within four business hours during US Eastern hours.
Get a free written proposalWhatsApp the founder
About the author

Zawwad Ul Sami, Founder

Zawwad Ul Sami is the founder of WeCostSeg, a founder-led cost segregation firm serving real estate investors across the US. He focuses on strategy, pricing, and the firm's overall direction.